Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Accessibility and Screen Reader Options
MMRC logo

Accessibility and Screen Reader Options

MMRC

Accessibility Options

Accessibility options enables you to increase or decrease the font size and/or change color scheme of this website according to your preferences.

Change Text Size

Change Contrast

Accessibility Statement

We are committed to ensure that the Mumbai Metro Rail Corporation Ltd. (MMRCL) website is accessible to all users irrespective of device in use, technology or ability. It has been built, with an aim, to provide maximum accessibility and usability to its visitors. As a result this website can be viewed from a variety of devices such as Desktop / Laptop computers, web-enabled mobile devices; etc.

We have put in our best efforts to ensure that all information on this website is accessible to people with disabilities. For example, a user with visual disability can access this website using assistive technologies.

We also aim to be standards compliant and follow principles of usability and universal design, which should help all visitors of this website.

If you have any problem or suggestion regarding the accessibility of this website, please xwrite to us to enable us to respond in a helpful manner. Do let us know the nature of the problem along with your contact information.

Screen Reader Access

The Mumbai Metro Rail Corporation Ltd. (MMRCL) website complies with World Wide Web Consortium (W3C) Web Content Accessibility Guidelines (WCAG) 2.0 level AA. This will enable people with visual impairments access the website using assistive technologies, such as screen readers. The information of the website is accessible with different screen readers.

Various Screen Readers to choose from

Screen ReaderWebsiteFree / Commercial
Non Visual Desktop Access (NVDA)https://www.nvaccess.org/downloadFree
System Access To Gohttp://www.satogo.comFree
Thunderhttp://www.screenreader.net/index.php?pageid=2Free
Web Anywherehttp://webanywhere.cs.washington.edu/wa.phpFree
Screen Access For All (SAFA)http://www.nabdelhi.org/NAB_SAFA.htmFree
System Access To Gohttp://www.satogo.comFree
Halhttp://www.yourdolphin.co.uk/productdetail.asp?id=5/Commerical
JAWShttp://www.freedomscientific.com/jaws-hq.aspCommerical
Supernovahttp://www.yourdolphin.co.uk/productdetail.asp?id=1Commerical
Window-Eyeshttp://www.gwmicro.com/Window-EyesCommerical
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो-३ डब्यांचे चार्जिंग सुरू
+26 Aug 2022
First train for underground Metro 3 corridor to reach city by March-end-Demo
+11 Jun 2022
When Will Metro Work Will End?
मेट्रो ३ टनलिंग का ९९ प्रतिशत मार्ग तयार
+09 May 2022
Monorail corridor to meet Metro
+03 May 2022
MMRDA commissioner takes over as MD of MMRCL
+19 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top