Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • Notice
    • Vigilance Awareness
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
    • RISK ASSESSMENT & MANAGEMENT POLICY
    • WHISTLE BLOWER POLICY
    • CORPORATE SOCIAL RESPONSIBILITY POLICY
Flash News
MMRC

Flash News

'Station Semi-Naming & Branding Rights at Mumbai Metro Line 3 (Stage-2)' RFP
Supplying consumable materials and maintenance of Electrical installations at Transit Office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2023- 2025)
Supplying consumable materials and maintenance of Electrical installations at Transit Office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2023- 2025)
'Station Semi-Naming & Branding Rights at Mumbai Metro Line 3 (Stage-2)' RFP
‘Appointment of Transaction Advisor for disposal of plot at Nariman Point for Metro Line 3’
Supplying consumable materials and maintenance of Electrical installations at Transit Office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2023- 2025)
Providing of motorized rolling shutters at Aarey colony car depot of Mumbai Metro Line ‐3 project
DISASTER CONTROL ROOM NUMBER - 8779177592
'Station Semi-Naming & Branding Rights at Mumbai Metro Line 3 (Stage-2)' RFP
Supplying consumable materials and maintenance of Electrical installations at Transit Office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2023- 2025)
  1. Home
  2. Project
  3. Project Consultants
MMRC logo

Project Consultants

MMRC

Mumbai Metro Rail Corporation has appointed the AECOM Asia led consortium (JV between Padeco, Japan, LBG Inc., USA and Egis Rail, France) as General Consultants for Mumbai Metro Line-3, on the 'Quality and Cost basis' in concurrence with JICA guidelines.

General Consultants are on board to assist MMRC in design, supervision, quality control, safety and contract management of the project. The overall scope of work for the General Consultants will be broadly as under:

  • Assist in evaluation of bids for civil works
  • Review and proof-checking of detailed designs
  • Prepare tender design and documents for procurement of track work, rolling stock, system components
  • Supervise construction including supply and installation
  • Supervise works and ensure safety, quality and environmental aspects
  • Commission of all system components
  • Test and commission the entire system
  • Preparation/finalization of operation and maintenance manuals
Maple Logo
MMRC

Recent News

mmrc
महाराष्ट्र की पहली अंडरग्राउंड मेट्रो
+03 Aug 2023
हुतात्मा स्मारक मेट्रो स्थानक पूर्णत्वाकडे
+03 Aug 2023
मेट्रो-३ च्या हुतात्मा चौक स्थानकाला हेरिटेज वास्तूंचे कोंदण
+02 Aug 2023
मेट्रो 3 की बाकी चार गाड़ियां सितंबर और नवंबर में आएंगी
+02 Aug 2023
मेट्रो-३ च्या चार गाड्या दोन टप्प्यांत येणार
+01 Aug 2023
First pedestrian subway connecting CSMT with Metro-3 gets go-ahead
+24 Jul 2023
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

Maintained by Best IT Company in Ludhiana

  • mmrc
  • mmrc
  • mmrc
  • mmrc
Top