Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Careers
  3. Careers
MMRC logo

Careers

MMRC
MMRC

Advertisement

S.No. Advertisement No. Title Last Date of Submission PDF File
MMRC 1 MMRCL/HR-Rect./ 2021-04 MMRCL Recruitment Advertisement 2021- 04 31st Dec 2022 link for PDF
MMRC 2 MMRCL/HR-Rect./ 2022-01 Addendum to MMRCL Recruitment Advt. 2022- 01 15th Apr 2022 link for PDF
Note:Extension in Closing Date of Advertisement and submission of Online Application.
MMRC 3 MMRCL/HR-Rect./ 2022-01 MMRCL Recruitment Advt. 2022- 01 25th Apr 2022 link for PDF
MMRC 4 MMRCL/HR-Rect./ 2021-05 Advertisement for the post of General Manager (Lands) 10th Jan 2022 link for PDF
Note:शासन निर्णय क्रमांक: एसआरव्ही-2011/प्र. क्र.137/कार्यासन 12, दिनांक: 17/12/2016
MMRC 5 MMRCL/HR-Rect./ 2021-03 MMRCL Recruitment Advertisement 2021- 03 25th Jun 2021 link for PDF
MMRC 6 MMRCL/HR-Rect./ 2021-02 MMRCL Recruitment Advertisement 2021- 02 16th Apr 2021 link for PDF
MMRC 7 MMRCL/HR-Rect./ 2021-01 MMRCL Recruitment Advertisement 2021- 01 16th Apr 2021 link for PDF
MMRC 8 - Information issued under MMRCL Recruitment Advt. 2020-01 - link for PDF
MMRC 9 MMRCL/HR-Rect./2016-06 MMRCL Recruitment 2016 (Phase 2) 02nd Sep 2016 link for PDF
Note:

Click Here to Login

MMRC 10 - Syllabus for MMRCL Recruitment 2016, Phase- II examination. 15th Oct 2016 link for PDF
Note:

Online examination will be held on 15th October, 2016

Click here for Hall Ticket

MMRC 11 MMRCL/HR-Rect./ 2020-01 MMRCL Recruitment Advertisement 2020 – 01 07th Aug 2020 link for PDF
MMRC 12 MMRCL/HR-Rect./ 2019-04 MMRCL Recruitment Advertisement 2019 - 04 24th Jan 2020 link for PDF
MMRC 13 MMRCL/HR-Rect./2019-03 Appointment for the post of Chief Vigilance Officer (CVO) 19th Dec 2019 link for PDF
Note:

Applications in the prescribed proforma shall be routed through proper channel only.

MMRC 14 MMRCL/HR-Rect./ 2019-02 MMRCL Recruitment Advertisement 2019 - 02 30th Sep 2019 link for PDF
MMRC 15 MMRCL/HR-Rect./ 2019-01 Addendum to MMRCL Recruitment to Advt. 2019- 01 18th Mar 2019 link for PDF
Note:

[ Increase in number of posts for EA to Executive Director (Planning) ]

MMRC 16 MMRCL/HR-Rect./ 2019-01 MMRCL/HR-Rect./ 2019-01 18th Mar 2019 link for PDF
MMRC 17 MMRCL/HR-Rect./2019-01 Appointment for the post of Chief Vigilance Officer (CVO) 01st Mar 2019 link for PDF
MMRC 18 - Corrigendum, MMRCL Recruitment Advt. 2018 – 04 10th Aug 2018 link for PDF
MMRC 19 MMRCL/HR-Rect./2018-04 MMRCL Recruitment Advertisement 2018 - 04 10th Aug 2018 link for PDF
MMRC 20 MMRCL/HR-Rect./2018-03 MMRCL Recruitment Advertisement 2018-03 21st May 2018 link for PDF
MMRC 21 MMRCL/HR-Rect./2018-02 MMRCL Recruitment Advertisement 2018-02 22nd Mar 2018 link for PDF
MMRC 22 MMRCL/HR-Rect./2018-01 MMRCL Recruitment Advertisement 2018-01 30th Jan 2018 link for PDF
MMRC 23 MMRCL/HR-Intern (W)./2017-18 List of selected Candidates & General Instructions for Winter Internship 2017-18 01st Jan 2018 link for PDF
MMRC 24 Recruitment Advertisement 2017- 06 MMRCL Recruitment Advertisement 2017- 06 06th Jan 2018 link for PDF
MMRC 25 MMRCL/HR-Intern (W)./2017-18 MMRCL Notification for Winter Internship -2017-18 11th Dec 2017 link for PDF
Note:

Start date of application - 1st December 2017

MMRC 26 MMRCL/HR-Rect./2017-05 MMRCL Recruitment Advertisement 2017- 05 03rd Nov 2017 link for PDF
MMRC 27 MMRCL/HR-Rect.2017 Vacancy Notice- Executive Assistant (EA) to Director (Finance) 25th Sep 2017 link for PDF
MMRC 28 MMRCL Recruitment Advertisement 2017- 03 MMRCL Recruitment Advertisement 2017- 03 08th Sep 2017 link for PDF
MMRC 29 MMRCL/HR-Rect./2017-04 MMRCL Recruitment Advertisement 2017-04 27th Aug 2017 link for PDF
MMRC 30 MMRCL/HR-Rect.2017 Advertisement for the post of उपजिल्हाधिकारी (भूसंपादन) [Dy. Collector (Land Acquisition)] 11th Jul 2017 link for PDF
Note:

शासन निर्णय क्रमांक: एसआरव्ही-2011/प्र. क्र.137/कार्यासन 12, दिनांक: 17/12/2016

MMRC 31 MMRCL/HR-Rect.2017-02 MMRCL Recruitment Advertisement 2017-02 31st May 2017 link for PDF
MMRC 32 MMRCL/HR-Rect./2017-01 MMRCL Recruitment Advertisement 2017-01 26th Feb 2017 link for PDF
MMRC 33 MMRCL/HR-Rect./2016-07 MMRCL Recruitment Advertisement 2016-07 20th Dec 2016 link for PDF
MMRC 34 - MMRCL Recruitment 2016, Phase- II Result - link for PDF
Note:

The shortlisted candidates will be intimated through interview letter according to the merit list.

MMRC 35 - MMRCL Recruitment 2016 (Phase- I) : RESULT - link for PDF
Note:

The shortlisted candidates will be intimated through interview letter according to the merit list.

MMRC 36 MMRCL/HR-Rect./2016-05 MMRCL Recruitment Advertisement 2016-05 12th Aug 2016 link for PDF
MMRC 37 - MMRCL Recruitment 2016 (Chief Vigilance Officer) 31st Aug 2016 link for PDF
MMRC 38 - MMRCL Recruitment 2016 (Phase- 1) 31st May 2016 link for PDF
MMRC 39 - Corrigendum - 1, MMRCL Recruitment 2016 (Phase - I) 10th Jun 2016 link for PDF
MMRC 40 - MMRCL Recruitment 2016, General Manager (Signal & Telecom) 10th Jun 2016 link for PDF
MMRC 41 - MMRCL Recruitment 2016 (Corrigendum 1 for Director (Finance)) 20th Mar 2016 link for PDF
MMRC 42 - MMRCL Recruitment 2016 (Director (Finance)) 01st Mar 2016 link for PDF
MMRC 43 - MMRCL Recruitment 2015 (Phase-3) 12th Jul 2015 link for PDF
MMRC 44 - MMRCL Recruitment 2015 (Phase-2) 12th Jul 2015 link for PDF
MMRC 45 - MMRCL Recruitment 2015 (Phase-1) 12th Jul 2015 link for PDF
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Reference Documents

Application Form File
MMRCL Equal Opportunity Policy under Section 21, RPwD Act, 2016 File
Recruitment Norms / Criterions File
Forms for SC & ST File
Form for OBC File
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top