Sr. No. | Title | Type | Tender Ref No | Date Of Issue | Download |
---|---|---|---|---|---|
61 | Construction of Residential cum Commercial High-rise building at Girgaon (G3) on CS No.1,4/59 and 7/59 of Girgaon division for rehabilitation of Metro Line-3 PAP’s at Kalbadevi and Girgaon. | Notice | MMRCL/Planninng/PQ/G3/2020/01 | 06/05/2020 | file |
62 | Tree Plantation of 9000 number of trees with minimum 3 trees per sqm by Miyawaki Concept / Method on 3000 sqm Plot bearing CTS No. 1408/A/2, Near Inorbit Mall, Mindspace, Goregaon (W), Mumbai and maintenance activities. | Addendum No 1 | MMRC/Planning/NIT/MTP/2020 | 27/03/2020 | file |
63 | Tree plantation of 9000 number of trees with minimum 3 trees per sqm by Miyawaki Concept/ Method on 3000 sqm plot bearing CTS No. 1402/A/2, Near Inorbit Mall, Mindspace, Goregaon (W), Mumbai and maintenance activities. | Corrigendum - 1 | MMRC/Planning/NIT/MTP/2020 | 27/03/2020 | file |
64 | Mumbai Metro Rail Corporation Limited (MMRCL) invites percentage rate tender through e-Tendering portal from experienced and eligible contractors for works of “TREE PLANTATION By MIYAWAKI Concept / Method on 3000 sqm Plot bearing CTS No. 1408/A/2, Near Inorbit Mall, Mindspace, Goregaon (W), Mumbai” | Notice | MMRCL/Planning/NIT/2020 | 19/03/2020 | file |
"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”
"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”