Sr. No. | Title | Type | Tender Ref No | Date Of Issue | Download |
---|---|---|---|---|---|
1 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC” Package-14 | Pre-Bid Query Response | MM3-CBS-AFC | 10/03/2017 | file |
2 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC” Package-14 | Pre-Bid Query Response | MM3-CBS-AFC | 08/03/2017 | file |
3 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC” Package-14 | Addendum No 3 | MM3-CBS-AFC | 01/03/2017 | file |
4 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC” Package-14 | Addendum No 2 | MM3-CBS-AFC | 17/02/2017 | file |
5 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC” Package-14 | Pre-Bid Query Response | MM3-CBS-AFC | 17/02/2017 | file |
6 | Invitation for Pre-qualification of bidders for "Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System: MM3-CBS-AFC Package-14 | Addendum No 1 | MM3-CBS-AFC | 08/02/2017 | file |
7 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System | Notice | MM3-CBS-AFC | 15/12/2016 | file |
8 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System | PQ Document | MM3-CBS-AFC | 15/12/2016 | file |
9 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing & Commissioning of Signalling & Train Control, Platform Screen Doors and Telecommunication Systems [MM3-CBS-STPT] Package 12 | Addendum No 5 | MM3-CBS-STPT | 16/09/2016 | file |
10 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing & Commissioning of Signalling & Train Control, Platform Screen Doors and Telecommunication Systems [MM3-CBS-STPT] Package 12 | Pre-Bid Query Response | MM3-CBS-STPT | 09/09/2016 | file |
"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”
"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”