Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Project
  3. Rehabilitation & Resettlement (R&R)
  4. Public Consultation
MMRC logo

Public Consultation

MMRC
MMRC
  • 17 May 2019
    'Minutes of Meeting of Public Consultation' held on 29th March 2019 (Girgaon) and 3rd April, 2019 (Kalbadevi)
    photo-gallery
  • 13 Aug 2018
    Kranti Nagar, building no. 260 A, 260B and 260 C, meeting held on 13th august 2018
    photo-gallery
  • 13 Aug 2018
    Chira Bazar Pvt. Market / Fish Market, building no. 511/539, meeting held on 13th Aug 2018
    photo-gallery
  • 13 Aug 2018
    Annapurna, building no. 270/72 – meeting held on 13th august 2018
    photo-gallery
  • 10 May 2018
    Annapurna, building no. 270/72 – meeting held on 10th may 2018.
    photo-gallery
  • 10 May 2018
    Kranti Nagar, building no. 260 A, 260B and 260 C, meeting held on 10th may 2018
    photo-gallery
  • 21 Jul 2016
    Marol, Chimatpada Public Consultation
    Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016, Marol, Chimatpada Public Consultation 21/06/2016
  • 28 Aug 2015
    Girgaon Kalbadevi Residents Association - Discussion Session With Them
    photo-gallery
  • 24 Aug 2015
    Oval Ground Association. Mumbai Discussion Session With Them
    photo-gallery
  • 29 Jul 2015
    Naya Nagar Public Consultation
     Naya Nagar Public Consultation - 29/07/2015,  Naya Nagar Public Consultation - 29/07/2015,  Naya Nagar Public Consultation - 29/07/2015,  Naya Nagar Public Consultation - 29/07/2015,  Naya Nagar Public Consultation - 29/07/2015,  Naya Nagar Public Consultation - 29/07/2015
  • 1
  • 2
  • 3
  • next ›
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC
Plus

2019[1]

  • May[1]
Plus

2018[5]

  • May[2]
  • August[3]
Plus

2016[1]

  • July[1]
Plus

2015[13]

  • February[1]
  • March[6]
  • June[2]
  • July[2]
  • August[2]
Plus

2014[4]

  • November[1]
  • December[3]
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top