Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. People Connect
  3. Quick Facts

Quick Facts

MMRC
Sr. No.Key Highlights
1

The 33.5 km long corridor will connect six business districts, 30 educational institutes, 30 recreational facilities and domestic as well as international airport terminals.

2

There are 27 stations (26 Underground+1 at grade) in Colaba-Bandra-SEEPZ corridor

3

6 Central Business Districts to be connected through this project are namely:

  • Cuffe Parade
  • Bandra-Kurla Complex
  • Colaba
  • MIDC
  • Worli
  • SEEPZ
4

The estimated cost of the project is around Rs. 23,136 Cr.

5

Project Funding: The project is partially funded by JICA (Japan International Cooperation Agency) through a soft loan of Rs. 13,235 Cr. Rest of the funding is provided by GoI, GoM and others

6

Economic Internal Rate of Return (EIRR): 17.89%

7

Financial Internal Rate of Return (FIRR): 3.2%

8

Project involves construction of tunnels and underground stations. This is a very challenging task and will be accomplished by deploying technologies such as tunneling by Tunnel Boring Machines(TBMs) and stations by methods of Cut and Cover or by NATM or by a combination of these two.

9

MML-3 to be 100% Electricity Driven System, leading to zero carbon emission

10

25kV AC traction with regenerative braking system will be used to:

  • Save energy costs worth around Rs. 50 Cr. per annum
  • Generate about 8 Cr. KWh of electricity that can be used at other metro stations
11

Capacity of each train is approximately 2500 passengers.

12

The design speed of the train is 90 kmph.

13

The commercial speed of the train will be 35 kmph including stoppages.

14

The projected ridership of MML-3 :

Ridership 2020Ridership 2021
13.0 Lakhs17.0 Lakhs
15

Frequency

YearColaba-BandraBandra-SEEPZNo. of Coaches
20203.5 min7 min210
20212.5 min5 min330
16

Design PHPDT for Mumbai Metro Line 3:

CorridorPHPDT 2021PHPDT 2031
Colaba-Bandra-SEEPZ39,00042,000
17

All Stations will be facilitated with state-of-the-art escalators and lifts.

18

Platform screen doors will be installed to avoid any accidental fall or mishap.

19

Automatic fare collection system and contact-less smart card will ensure ‘zero’ revenue loss.

20

Smart Lighting and smart air-conditioning will be provided to conserve energy.

21

Ease and Comforts of Mumbai Metro Line 3:

  • High frequency of Trains with 100 % time adherence
  • Platform Screen Doors for passenger safety.
  • Women safety and security
  • Broad gangways Token/Smart Card Counters and Ticket Vending Machine
  • Smart navigational concourse
  • Fully Air conditioned Stations and trains
  • First Aid Rooms
  • Wheelchair for handicapped and senior citizens
  • Centralized control of train operations
  • 24*7 CCTV surveillance
  • Emergency Evacuation
22

Rolling Stock:

  • Modern rolling stock
  • Automatic train operation
  • Air Conditioned & Closed door train
  • 3200 mm wide - 3 phase propulsion system powered through 25 KV AC OHE
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो-३ डब्यांचे चार्जिंग सुरू
+26 Aug 2022
First train for underground Metro 3 corridor to reach city by March-end-Demo
+11 Jun 2022
When Will Metro Work Will End?
मेट्रो ३ टनलिंग का ९९ प्रतिशत मार्ग तयार
+09 May 2022
Monorail corridor to meet Metro
+03 May 2022
MMRDA commissioner takes over as MD of MMRCL
+19 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top