Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Tenders
  3. MMRC Contractors

MMRC Contractors

MMRC
Sr.NoWorkCompany/Consortium/JV
1Civil Works - Tunnels & StationM/S L&T-STEC JV
2Civil Works - Tunnels & StationM/S HCC-MMS JV
3Civil Works - Tunnels & StationM/S DOGUS-SOMA
4Civil Works - Tunnels & StationM/S CEC-ITD CEM-TPL JV
5Civil Works - Tunnels & StationM/S J. Kumar-CRTG
6Civil Works - Tunnels & StationM/S J. Kumar-CRTG
7Civil Works - Tunnels & StationM/S L&T-STEC JV
8Civil Works - DepotSAM (INDIA) BUILTWELL PVT LTD
9System Works - TractionCONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A.
10System Works - Power Supply WorksM/s LARSEN & TOURBO LIMITED
11System Works - Signaling & Train control, PSD, Telecommunication System and M&E SCADACONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A., FRANCE
12System Works - Automatic Fare CollectionCONSORTIUM OF M/S. ASIS ELECTRONIK VE BILLISIM SISTEMLERI A.S., TURKEY AND KALINDEE RAIL NIRMAN-A DIVISION OF TEXMACO RAIL & ENGINEERING LIMITED, INDIA (KALINDEE - ASIS JV)
13System Works - Escalator Works

Lot E2: Johnson- SJEC Consortium, Lot E1: Yuanda- Royal Consortium

14System Works - Elavator/Lift Works

Lot L2: Yuanda-Royal Consortium, Lot L1: Joint Venture of IFE and Cranex

15System Works - Rolling StockCONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A.
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो-३ डब्यांचे चार्जिंग सुरू
+26 Aug 2022
First train for underground Metro 3 corridor to reach city by March-end-Demo
+11 Jun 2022
When Will Metro Work Will End?
मेट्रो ३ टनलिंग का ९९ प्रतिशत मार्ग तयार
+09 May 2022
Monorail corridor to meet Metro
+03 May 2022
MMRDA commissioner takes over as MD of MMRCL
+19 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top