Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Tenders
  3. Project Status

Project Status

MMRC

The MML-3 Project is divided into 18 main packages of ‘Project’ & ‘System’ wings.

Package wise status of the project is as under:

PackagesNature of WorkName of ContractorAmtStatusTarget for Contract Award
Package 1Civil Works – Tunnels & StationsL&T-STEC JVRs. 2,988.53 crLetter of Acceptance Issued to ContractorAwarded
Package 2Civil Works – Tunnels & StationsHCC-MMS JVRs. 2,521.89 crLetter of Acceptance Issued to ContractorAwarded
Package 3Civil Works – Tunnels & StationsM/S DOGUS-SOMARs. 2,557.84 crLetter of Acceptance Issued to ContractorAwarded
Package 4Civil Works – Tunnels & StationsM/S CEC-ITD CEM-TPL JVRs. 2,830.10 crLetter of Acceptance Issued to ContractorAwarded
Package 5Civil Works – Tunnels & StationsM/S J. Kumar-CRTGRs. 2,817.02 crLetter of Acceptance Issued to ContractorAwarded
Package 6Civil Works – Tunnels & StationsM/S J.Kumar-CRTGRs. 2,118.40 crLetter of Acceptance Issued to ContractorAwarded
Package 7Civil Works – Tunnels & StationsL&T-STEC JVRs. 2,281.45 crLetter of Acceptance Issued to ContractorAwarded
Package 8Civil – DepotSAM (INDIA) BUILTWELL PVT LTDRs. 328.26 crLetter of Acceptance Issued to ContractorAwarded
Package 9Plant & Equipment for Depot--No JICA concurrence required for the packages as per Loan Agreement Schedule 4 Sect. 3 Cl. No. 3 (JICA letter dtd: 26-06-18)-
Package 10BMM3-CBS-TWK-02 (Package 10-B) Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on the Mainline from BKC station (excluded) to Cuffe Parade station (included) excluding the procurement and supply of Head Hardened rail 60 E1 (UIC 60), 1080 grade HH, Turnouts, Scissor Crossovers and Buffer Stops for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ). Part Design, Procurement and Supply of Rail Fasteners System for the ballastless Track for the Mainline including Contract Package 10 A for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ).M/s LARSEN & TOURBO LIMITED (India)Rs.303.27 crLetter of Acceptance Issued to ContractorAwarded
Package 10CMM3-CBS-TWK-03 (Package 10C) Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B.M/s LARSEN & TOURBO LIMITED (India)-Letter of Acceptance Issued to ContractorAwarded
Package 10DMM3-CBS-TWK-04 (Package 10 D) Supply of 8490 MT (Revised Qty. 10740) Head Hardened (HH) Rails (UIC 60E1, IRS-T-12:2009, 1080 grade) for Track Work of Mumbai Metro Line 3 (Colaba-Bandra -SEEPZ) Rail Project. (Variation Order for additional 2250 MT)M/s Mitsui & Co. LIMITED (Japan)-Letter of Acceptance Issued to ContractorAwarded
Package 11ATraction Works

CONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A.

Rs. 272.43 cr

Letter of Acceptance Issued to Contractor

Awarded
Package 11BPower Supply Works

M/s LARSEN & TOURBO LIMITED 

Rs. 338.37 cr

Letter of Acceptance Issued to Contractor

Awarded
Package 12Signaling & Train control, PSD, Telecommunication System and M&E SCADACONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A., FRANCE-

Letter of Acceptance Issued to Contractor

Awarded
Package 13Station Security System----
Package 14Automatic Fare CollectionCONSORTIUM OF M/S. ASIS ELECTRONIK VE BILLISIM SISTEMLERI  A.S., TURKEY AND KALINDEE RAIL NIRMAN-A DIVISION OF TEXMACO RAIL & ENGINEERING LIMITED, INDIA (KALINDEE - ASIS JV)-

Letter of Acceptance Issued to Contractor

Awarded
Package 15Tunnel Ventilation & Environmental Control System

M/s Shanghai Tunnel Engineering Co. Ltd - Phase-1

M/s Blue Star Limited - Lot-1 of Phase-2

M/s Voltas Limited - Lot-2 of Phase-2

-

Letter of Acceptance Issued to Contractor for Phase-1

Letter of Acceptance Issued to Contractor for Lot-1 of Phase-2

Letter of Acceptance Issued to Contractor for Lot-2 of Phase-2 .

Awarded
Package 16AEscalator Works

Lot E2: Johnson- SJEC Consortium

Lot E1: Yuanda- Royal Consortium

-

Lot E2: Letter of Acceptance Issued to Contractor 

Lot E1:Letter of Acceptance Issued to Contractor

Awarded
Package 16BElavator/Lift Works

Lot L2: Yuanda-Royal Consortium

Lot L1: Joint Venture of IFE and Cranex

-

Lot L2: Letter of Acceptance Issued to Contractor

Lot L1: Letter of Acceptance Issued to Contractor

Awarded
Package 17Rolling StockCONSORTIUM OF ALSTOM TRANSPORT INDIA LTD & ALSTOM TRANSPORT S.A.-

Letter of Acceptance Issued to Contractor

Awarded
Package 18General Consultant--General Consultants engaged.-
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो-३ डब्यांचे चार्जिंग सुरू
+26 Aug 2022
First train for underground Metro 3 corridor to reach city by March-end-Demo
+11 Jun 2022
When Will Metro Work Will End?
मेट्रो ३ टनलिंग का ९९ प्रतिशत मार्ग तयार
+09 May 2022
Monorail corridor to meet Metro
+03 May 2022
MMRDA commissioner takes over as MD of MMRCL
+19 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top