Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Internship Policy
    • Recruitment
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Vigilance
    • Vigilance Gallery
  • Contact Us
    • Compliance Officer & Company Secretary
    • How to reach us
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477 Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  1. Home
  2. निविदा
  3. Latest Tenders
  4. Planning
  5. Latest Tenders
mmrc icon

Planning

MMRC
Sr. No. Title Type Tender Ref No Date Of Issue Download
1 DPR, EIA, & SIA Preparation for Southern Extension of Mumbai Metro Line-3; Cuffe Parade to Navy Nagar RFP MMRC/Planning/PLN/38/RFP/01/2022 02/08/2022 file
2 Appointment of Consultant for Preparation of Detailed Project Report (DPR), Environment Impact Assessment (EIA) & Social Impact Assessment (SIA) Report for Southern Extension of Mumbai Metro Line-3 from Cuffe Parade to Navy Nagar RFP 02/08/2022 file
3 Supply, Installation and commissioning of 1.5 TPD capacity Bio-methanation plant along with electricity generation from municipal organic wet waste with 1 year operation and maintenance at LT Market, D Ward, MCGM, Mumbai under Corporate Environment Responsibility (CER) scheme in compliance to EC received for Kalbadevi Redevelopment Building Project Notice MML3/Planning/ENV/CER/WTE/22/2022 14/06/2022 file
4 Civil Maintenance Contract for R & R Sites, MMRCL Transit Office and Civil & Electrical Work at MMRCL Hallmark Business Plaza 2nd & 8th Floor Offices and other allied works under Mumbai Metro Line III of MMRCL. (2nd Call) Notice MMRC/Planning/NIT/Maintenance/22/01/2nd call 30/03/2022 file
5 GUIDELINES FOR EMPANELMENT OF ADVOCATE(s)/LAW FIRM(s) EOI MMRCL/Planning 17/03/2022 file
6 Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments Corrigendum 3 MMRC/Planning/NFBR/Direct Access/30C/RFP02/2022 25/02/2022 file
7 Appointment of Technical Consultant for providing Comprehensive Architectural, Structural, MEP Designing and Liasoning for Development of staff quarters for MMRC at Dharavi (2nd Call) Corrigendum - 1 MMRCL/Planning/PLN55B/DHARAVI/RFP/02/2021 21/02/2022 file
8 Appointment of Technical Consultant for providing Comprehensive Architectural, Structural, MEP Designing and Liasoning for Development of staff quarters for MMRC at Dharavi (2nd Call) Notice MMRCL/Planning/PLN55B/DHARAVI/RFP/02/2021 21/02/2022 file
9 Appointment of Technical Consultant for providing Comprehensive Architectural, Structural, MEP Designing and Liasoning for Development of staff quarters for MMRC at Dharavi (2nd Call) RFP MMRCL/Planning/PLN55B/DHARAVI/RFP/02/2021 21/02/2022 file
10 Appointment of Technical Consultant for providing Comprehensive Architectural, Structural, MEP Designing and Liasoning for Development of staff quarters for MMRC at Dharavi (2nd Call) Response To Queries MMRCL/Planning/PLN55B/DHARAVI/RFP/02/2021 21/02/2022 file
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
MMRC

Stay Informed

10 + 0 =
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो-३ डब्यांचे चार्जिंग सुरू
+26 Aug 2022
First train for underground Metro 3 corridor to reach city by March-end-Demo
+11 Jun 2022
When Will Metro Work Will End?
मेट्रो ३ टनलिंग का ९९ प्रतिशत मार्ग तयार
+09 May 2022
Monorail corridor to meet Metro
+03 May 2022
MMRDA commissioner takes over as MD of MMRCL
+19 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top